SEP were tasked with carrying out a Topographical survey and installing precise control at the main runway at East Midlands Airport which was to be resurfaced.

Challenges


  • Survey works are not to inhibit the normal flight patterns for the international airport meaning that the survey was performed during the night over three slots.

  • Winter and night time conditions presented unique challenges to the project


Results

The survey works were completed using our state of the art Focus 35 Robotic Total Stations over a period of three weekend night shifts. A Topographical and Level survey was issued showing existing levels and allowed the designers to understand high and low spots over the full length of the airfield to millimetre accuracy

Share:

Project Details

Date

Nov 2016

Client

Galliford Try

Survey

Topographical Survey

Location

East Midlands Airport

Delivery Formats

CAD Drawing - DWG

Information

[vc_row][vc_column width=”1/2″]

Home
About Us
Services
Our Work

[/vc_column][vc_column width=”1/2″]

Videos
Group Services
Careers
Contact

[/vc_column][/vc_row]

Contact Us

Survey & Engineering Projects Ltd
Unit 3D,
Selby Place,
Stanley Industrial Estate,
Skelmersdale
WN8 8EF

Tel: 01695 729 835
Email: info@sepsurvey.com

Latest Tweets

SEPLtd

- 40 days ago

📷 Some engineering works at the iconic Battersea Power Station, the largest brick structure in Europe. Alongside th… https://t.co/6hPGJ5vNlZ
h J R
SEPLtd

- 48 days ago

📷 Some ongoing #engineering works at the iconic Battersea Power Station in London, which is soon to be home to Appl… https://t.co/cvh4eQJeKc
h J R
SEPLtd

- 54 days ago

RT @BattyeB: Big thanks to Harry & Mike from @SEPltd for coming in to do a Lunch & Learn on laser scanning with the team! #sepsurveys #alwa…
h J R