Project

SEP were tasked with carrying out a Topographical survey and installing precise control at the main runway at East Midlands Airport which was to be resurfaced.

Challenges


  • Survey works are not to inhibit the normal flight patterns for the international airport meaning that the survey was performed during the night over three slots.

  • Winter and night time conditions presented unique challenges to the project


Results

The survey works were completed using our state of the art Focus 35 Robotic Total Stations over a period of three weekend night shifts. A Topographical and Level survey was issued showing existing levels and allowed the designers to understand high and low spots over the full length of the airfield to millimetre accuracy

Share:

Project Details

Date

Nov 2016

Client

Galliford Try

Survey

Topographical Survey

Location

East Midlands Airport

Delivery Formats

CAD Drawing - DWG

Information

[vc_row][vc_column width=”1/2″]

Home
About Us
Services
Our Work

[/vc_column][vc_column width=”1/2″]

Videos
Group Services
Careers
Contact

[/vc_column][/vc_row]

Contact Us

Survey & Engineering Projects Ltd
Unit 3D,
Selby Place,
Stanley Industrial Estate,
Skelmersdale
WN8 8EF

Tel: 01695 729 835
Email: info@sepsurvey.com

Latest Tweets

SEPLtd

- 20 days ago

Today, our #Revit and #CAD technician Jake Howard gave a fantastic introductory lecture on #Pointcloud and Revit in… https://t.co/NmBFCDv9bK
h J R
SEPLtd

- 35 days ago

SEP #Rail Services work in partnership with contractors and consultants, measuring and modelling the nation’s railw… https://t.co/fLTDlXY2HX
h J R
SEPLtd

- 41 days ago

The dedicated team of specialist staff at SEP #Rail Services use cutting-edge software, equipment and expertise to… https://t.co/Mh19QaPrNm
h J R