SEP were contracted to conduct numerous underground utility surveys of proposed borehole locations around the Preston and South Ribble area. These surveys were to detect the presence or absence of services in preparation for the drilling of boreholes.

Challenges
The ground investigation team had been arranged to carry out drilling on the Monday morning but access to conduct the clearance surveys wasn’t possible until the Friday. Our survey team needed to mobilize, survey all the necessary areas, and then deliver the data to our CAD team for processing. A member of our CAD team then worked over the weekend to produce drawings ready for delivery to site on Monday morning.

Results
The swift mobilisation, data processing, and drawing production ensured that our clients ground investigation works were not delayed. Sub-contractors were able to carry out their tasks without impediment minimising the costs to our client.

Share:

Project Details

Date

Mar 19

Location

Preston

Delivery Formats

AutoCAD & Site Mark out

Works Duration

1 Day

Information

[vc_row][vc_column width=”1/2″]

Home
About Us
Services
Our Work

[/vc_column][vc_column width=”1/2″]

Videos
Group Services
Careers
Contact

[/vc_column][/vc_row]

Contact Us

Survey & Engineering Projects Ltd
Unit 3D,
Selby Place,
Stanley Industrial Estate,
Skelmersdale
WN8 8EF

Tel: 01695 729 835
Email: info@sepsurvey.com

Latest Tweets

SEPLtd

- 6 hours ago

📷: One of our engineers working on-site in sunny Southport, using a Spectra Precision GPS system supplied by our in… https://t.co/NtBIEFQrs0
h J R
SEPLtd

- 6 days ago

SEP’s #Surveys department have recently worked on some floor plans and elevations of the Kelvin Building, located i… https://t.co/JL74a9SpOz
h J R
SEPLtd

- 7 days ago

📷: One of our surveyors undertaking some in-depth survey works near the Jodrell Bank Observatory, which is now offi… https://t.co/giNMPkkhtf
h J R