Infrastructure

The former Whiston Library

Project SEP were tasked with carrying out an Underground Utility Survey to BSI PAS128:2014 standards at the former Whiston Library. Challenges When looking to start construction work on any site it is vital that a utility survey is undertaken before the ground is broken. A utility survey

Read more

Pharmaceuticals Laboratory

Project Survey & Engineering Projects were tasked with undertaking a laser scanner survey of a laboratory owned and operated by a major pharmaceuticals manufacturer and distributor. From this gathered point cloud data we were to produce detailed 3D Revit models of the structure and plant. Challenges The

Read more

Preston & South Ribble Borehole Clearances

Project SEP were contracted to conduct numerous underground utility surveys of proposed borehole locations around the Preston and South Ribble area. These surveys were to detect the presence or absence of services in preparation for the drilling of boreholes. Challenges The ground investigation team had been arranged

Read more

Royal Liverpool Hospital

Project SEP were asked to survey a building and the surrounding area for a new hospital. SEP are in a unique position to supply all pre-construction surveys to develop design plans for the new hospital building and car parks. Challenges Our Survey team worked with the Hospital

Read more

3D Model Survey at Merseyway Bridge & Culvert.

Project Survey & Engineering Projects were tasked with producing a 3D Revit model at ST048 Mersey way bridge and with the culvert below in Stockport. The model includes a low level of detail for the surrounding buildings for context. A higher level of detail was used for

Read more

Hospital Plant Room Survey

Project Survey & Engineering Projects were tasked with producing a full Revit model of a plant floor within a large hospital in the north of England, the model was to include all plant, pipes and other M&E fittings Challenges Works were carried out in the working plant

Read more

Hanger Roof Model

Project SEP were asked to survey and provide a 3D Revit model of the roof structure on a large aircraft hangar. Challenges The roof was a very large area and we had set times we could be on site. Two teams were deployed simultaneously to laser scan

Read more

Derby Velodrome

Project SEP were asked to set out the positioning of the foul line at the Derby Arena Velodrome and certify the radius of the circuit. Challenges The positioning of the line needed to be within an accuracy of 5mm. The helix shape of the sloping track has

Read more

Fertiliser Plant 3D Model

Project Survey & Engineering Projects were asked to produce a full 3D solid model of a fertiliser production plant. This was to be used for explosion and consequence analysis. Challenges Live working environments offer different complexities, especially when they have hazardous or chemical materials on site that

Read more

East Midlands Airport

Project SEP were tasked with carrying out a Topographical survey and installing precise control at the main runway at East Midlands Airport which was to be resurfaced. Challenges Survey works are not to inhibit the normal flight patterns for the international airport meaning that the survey was

Read more

Contact Us

Survey & Engineering Projects Ltd
Unit 3D,
Selby Place,
Stanley Industrial Estate,
Skelmersdale
WN8 8EF

Tel: 01695 729 835
Email: info@sepsurvey.com

Latest Tweets

SEPLtd

- 20 days ago

Today, our #Revit and #CAD technician Jake Howard gave a fantastic introductory lecture on #Pointcloud and Revit in… https://t.co/NmBFCDv9bK
h J R
SEPLtd

- 35 days ago

SEP #Rail Services work in partnership with contractors and consultants, measuring and modelling the nation’s railw… https://t.co/fLTDlXY2HX
h J R
SEPLtd

- 41 days ago

The dedicated team of specialist staff at SEP #Rail Services use cutting-edge software, equipment and expertise to… https://t.co/Mh19QaPrNm
h J R