Topographical

Cheshire Drone Survey

Project SEP were contracted to carry out a topographical survey of a large housing development. Since work onsite was ongoing the field data needed to be captured very quickly, so as to ensure the survey provided a true snapshot in time for the muckshift operations Challenges As

Read more

The former Whiston Library Measured Survey

Project SEP were tasked with carrying out an Underground Utility Survey to BSI PAS128:2014 standards at the former Whiston Library. Challenges When looking to start construction work on any site it is vital that a utility survey is undertaken before the ground is broken. A utility survey

Read more

Royal Liverpool Hospital Measured Surveys

Project SEP were asked to survey a building and the surrounding area for a new hospital. SEP are in a unique position to supply all pre-construction surveys to develop design plans for the new hospital building and car parks. Challenges Our Survey team worked with the Hospital

Read more

Hospital Accident & Emergency, Oxfordshire

Project Our client was designing modifications and refurbishments to the A&E entrance of a major hospital in Oxfordshire. SEP was asked to deliver a topographical survey in 2D and 3D AutoCAD, trace and map underground services, and laser scan the A&E entrance to produce 2D elevations and

Read more

Linthwaite House

Project Survey & Engineering Projects were asked to carry out a Bathymetric Survey of a lake outside a hotel. The hotel wanted to understand more about their lake and to plan future developments. Challenges When working in and around water, safety is paramount. The safest option was

Read more

Asda Stores Nationwide

SEP work for ASDA and various ASDA consultants undertaking a wide range of surveys from Topographical, Underground Utility and Measured Building Surveys for new and existing store car parks throughout the UK. Measured Floor Plans, Elevations and Ecology Surveys of existing stores and surrounding areas have been

Read more

East Midlands Airport Topographical Survey

Project SEP were tasked with carrying out a Topographical survey and installing precise control at the main runway at East Midlands Airport which was to be resurfaced. Challenges Survey works are not to inhibit the normal flight patterns for the international airport meaning that the survey was

Read more

Contact Us

Survey & Engineering Projects Ltd
Unit 3D,
Selby Place,
Stanley Industrial Estate,
Skelmersdale
WN8 8EF

Tel: 01695 729 835
Email: info@sepsurvey.com

Latest Tweets

SEPLtd

- 40 days ago

📷 Some engineering works at the iconic Battersea Power Station, the largest brick structure in Europe. Alongside th… https://t.co/6hPGJ5vNlZ
h J R
SEPLtd

- 48 days ago

📷 Some ongoing #engineering works at the iconic Battersea Power Station in London, which is soon to be home to Appl… https://t.co/cvh4eQJeKc
h J R
SEPLtd

- 54 days ago

RT @BattyeB: Big thanks to Harry & Mike from @SEPltd for coming in to do a Lunch & Learn on laser scanning with the team! #sepsurveys #alwa…
h J R